My Lords, I think this is the last amendment of the day. My reason for putting this down was to probe the rather obscure wording in Schedule 17 that allows in the included ancillary matters the,
“handling of re-useable spoil or topsoil”.
I am not sure what that means—perhaps the Minister can help me to define it. For me, the word “spoil” could include all the material coming out of a 10-mile-long tunnel bore—probably several million tonnes. If HS2 is to be allowed to deposit this stuff wherever it likes because it can give itself planning permission, that does not seem a good idea to me. Maybe it does not cover such large volumes, and it will just be small bits of excavation here or there which do not matter very much. Paragraphs (2)(b) to (g) include what are normal construction activities, such as storage sites for
construction materials, construction camps, works screening, lighting and dust suppression. I feel comfortable with their being in the schedule. However, the word “spoil” hit me, and I wondered what it included. If the Minister cannot answer that question today, he can always write to me. It is not the end of the world, but it would just be nice to know. I can always bring it back on Report if I have to. On that basis, I beg to move.