Nuclear Energy (Financing) Bill

Proceeding contribution from Alan Whitehead (Labour) in the House of Commons on Monday, 10 January 2022. It occurred during Debate on bills on Nuclear Energy (Financing) Bill.

Sorry, no—I have a general habit of wearing a mask whenever possible.

The Bill essentially falls into three parts. Part 1 concerns the designation of a company for the receipt of regulated asset base payments. Part 2 concerns the collection and

disbursement of funds through the regulated asset base arrangements. Part 3 sets out a special administration regime, should a nuclear power plant be unable to carry out its obligations arising from the institution of the regulated asset base arrangement.

The Bill, essentially, is trying to produce a method for funding and getting over the line one particular nuclear power plant: Sizewell C. That is the only plant that is developed enough to be able to generate by 2030. A substantial part of the Bill is not about the general future of nuclear, or the relationship with nuclear renewables; it is about how one plant is to be financed over the next period so that it can actually start producing energy, hopefully by the end of this decade or shortly thereafter.

The Labour party supports nuclear power for the future and is particularly concerned that, for example, the Climate Change Committee has indicated that some 8 GW of nuclear power might be put in the mix for low-carbon renewable power for the future. Sizewell C is an important part of that process—indeed, getting it going is long overdue. Perhaps I can put the record straight, because the previous Labour Government, as the 2007 nuclear White Paper and the strategic planning documents of 2009-10 show, laid the basis for the present number of sites to be considered and, therefore, for nuclear power going forward.