UK Parliament / Open data

Nuclear Energy (Financing) Bill

I completely agree. I was happy to co-sign the cross-party letter from the all-party parliamentary group on marine energy, which I fully support. I hope that the Minister is listening, because this is a matter that we agree on across parties.

Looking at other technologies that we should be spending money on, I compliment the UK Government on seeing the opportunities that floating offshore wind can bring, but let us start deploying it much more quickly and investing more money, because that is where the real future is. Clearly, the further out to sea the turbines are, the greater the reliability of wind and subsequent generation.

There needs to be much greater investment in carbon capture and storage. The Government need to reverse their disgraceful decision not to have a Scottish cluster as part of their track 1 CCS projects. A Scottish cluster would also deliver hydrogen production, which is vital on the pathway to net zero.

We heard earlier, as we always do, the argument that nuclear is required for when the sun does not shine and the wind does not blow, but as I have tried to point out to the Minister, there is an existing technology that can address that issue: pumped storage hydro, a renewable energy source that utilises surplus grid energy to fill the reservoirs and can then dispatch electricity when required. Pumped storage hydro is the perfect foil for intermittent renewables, rather than big, inflexible nuclear power stations that invariably pump energy to the grid when it is not required. An Imperial College report suggests that there could be system savings of £700 million a year from using pumped storage hydro technology instead of nuclear.

SSE has all the necessary permissions in place, right now, to progress a new pumped storage hydro scheme at Coire Glas in the Highlands. It is progressing the design at its financial risk, and all that it needs is agreement with the Government and a minimum floor price for electricity—not a strike rate and not direct funding, just a minimum guarantee on the sale price of electricity. Then the development can reach the construction stage, and can be commissioned in the same timeframe as Hinkley. I ask the Government to reconsider, and to get round the table with SSE and other developers.

Type
Proceeding contribution
Reference
702 cc992-3 
Session
2021-22
Chamber / Committee
House of Commons chamber
Back to top