UK Parliament / Open data

Environment Bill

My Lords, wastewater infrastructure in England is a bit of a mess, as many noble Lords have said. I remember that when I came down from Scotland to live in England 40 years ago, I was amazed because in Scotland surface water and foul water were strictly separated. Discovering with horror that the casual intermingling of surface water drainage and sewerage systems was almost the rote in England—a curious mix of some legal stuff and some illegal arrangements—just staggered me.

We have not made much progress in those 40 years. There has been insufficient investment in drainage and sewerage infrastructure, and Ofwat does not always take the consequent environmental problems seriously enough in its price determinations. I welcome the requirement in the Bill for sewerage undertakers to prepare and, hopefully, implement drainage and sewage management plans, but I support Amendment 162A, tabled by the noble Lord, Lord Cameron of Dillington. It would give these plans an environmental objective, which, hopefully, would encourage Ofwat to agree more investment for environmental purposes.

Amendment 164 in the name of the noble Lord, Lord Bradshaw, would end the automatic right to connect, and it has been supported by a number of noble Lords. Water companies need to be able to say no to connecting developments where sewerage systems are already overloaded. The amendment would also kick-start discussions well in advance to ensure that adequate sewage treatment could be provided in appropriate time, at the point where developments can be flexible, and prevent future environmental damage. Amendment 192, in the name of the noble Baroness, Lady McIntosh of Pickering, would have a similar effect, although in the more restricted ambit of major new housing developments.

I am reminded of a dreadful face-off that had to take place between the Environment Agency and the developers of Corby when I was the agency’s chief executive. My noble friend Lord Rooker, who I am deeply grateful is not in his place, was Minister at the time and very keen on the redevelopment of Corby in the interest of jobs. Frankly, he beat me up severely to try to persuade the Environment Agency to provide

the necessary licences for that development. Corby was going to increase in size massively but was perched on the top of a tiny, failing Victorian sewerage system that simply would not have coped. The face-off went on for months but eventually resulted in funds being found to improve the sewerage system. The development went ahead, but I must admit that I only ever enter Corby incognito since they appear to have quite long memories in those parts.

I have a particular question for the Minister. On the implementation of drainage and sewage management plans, what assurances can he give that the successive water price rounds, as determined by Ofwat, will provide the right level of funding for drainage and sewage management plans over a reasonably short space of time? Price rounds come round only periodically, and stretching that over several cycles would mean that we were still waiting a very long time for the improvement to our sewerage and drainage systems that needs to be delivered.

Type
Proceeding contribution
Reference
813 cc1296-7 
Session
2021-22
Chamber / Committee
House of Lords chamber
Back to top