UK Parliament / Open data

Railways (Safety, Access, Management and Interoperability) (Miscellaneous Amendments and Transitional Provision) (EU Exit) Regulations 2019

My Lords, I too thank the Minister for explaining the content and purpose of this draft statutory instrument, which relates to a no-deal scenario. I also thank the Minister and her officials for the meeting yesterday. I do not think that anything I am going to say will come entirely as a surprise to the Minister and I am afraid that I will repeat some of the points made by the noble Baroness, Lady Randerson.

I have a number of questions about the content of the Explanatory Memorandum, some of which will, no doubt, relate to issues about which I am still not entirely clear. First, how does an EU portable Part A safety certificate currently differ from a Part A safety

certificate from the Office of Rail and Road, if at all, and how will they differ in the future? When introducing this SI, the Minister said that the two-year period to which this SI relates,

“provides an appropriate amount of time in which industry can prepare and align themselves with the Great British domestic certification regime”,

before going on to talk about it giving Great Britain “appropriate control”. In the light of that comment about giving time for the industry to prepare and align itself with the British domestic certification regime, what will the industry have to do in the two-year period to achieve that preparation and alignment with the British domestic certification regime? What actions will it have to take, because there has been talk of there being similarity between the two? It would be helpful if that comment could be clarified; it was also made by the Transport Minister in the Commons when the SI was debated there. I am not entirely clear about what the industry will have to do in that two-year period to prepare and to align itself with the domestic certification regime.

Will operators of services travelling from mainland Europe to the UK require both a UK Part A safety certificate and a Part A certificate issued in an EU member state? Clarification on that point would be helpful. Will a mainland Europe operator with a Part A certificate issued in an EU member state have to acquire a UK Part A safety certificate before bidding for a rail franchise, or will it have to acquire such a certificate only if it is successful in its franchise bid?

What is the position for a train operator in Northern Ireland? What Part A certificate will it require? Will it be a UK one or an EU member state one? Paragraph 4.1 of the Explanatory Memorandum, headed “Extent and Territorial Application”, suggests that, in Northern Ireland, an operator will have an EU member state-issued Part A safety certificate because, as I understand it, it is not covered by the part of the SI that relates to the Part A safety certificates. Once again, some clarification of that issue would be extremely helpful.

In addition, if an operator in Northern Ireland has an EU member state-issued Part A safety certificate, who will issue it and who has issued the current Part A safety certificate? Who has issued the current one and who will issue a future one if the train operator in Northern Ireland had an EU member state Part A certificate rather than one issued by the Office of Rail and Road?

I want to make two points on the Explanatory Memorandum, one of which is exactly the one made by the noble Baroness, Lady Randerson, about paragraph 2.5. I know that I am repeating what has already been said but, to recap, it states:

“The UK notified the Commission on 29 November 2018 that it intended to transpose the recast Railway Safety Directive by the later permitted transposition deadline of June 2020, though this will depend on the nature of Brexit on 31 October 2019”.

My question is slightly different from that posed by the noble Baroness and is simply to ask what the current position is on transposing the recast directive.

Since the memorandum refers to it being dependent on the nature of Brexit, how will the nature of Brexit affect the transposition?

Finally, paragraph 2.11 of the Explanatory Memorandum states that, once the UK has left the EU:

“There will be an opportunity for the UK to shape its own railway to meet the needs of our passengers and freight shippers”.

What will we be able to do in the future to shape our own railway that the Government are in effect saying we cannot do at the moment under the present arrangements? I am not entirely clear on the answer to that question.

Type
Proceeding contribution
Reference
800 cc82-4GC 
Session
2019-19
Chamber / Committee
House of Lords Grand Committee
Back to top