UK Parliament / Open data

High Speed Rail (London-West Midlands) Bill

My Lords, I am grateful to all noble Lords who have spoken in this short debate. At one stage, I felt that I had really put the cat among the pigeons in an unacceptable way, but we have come back to the text of the amendments, and I am grateful for the Minister’s response. I want the scheme to go ahead. It is needed for capacity, as my noble friend Lord Adonis said. My worry is to do with the costs. As the Minister knows, I have been meeting senior officials of HS2 and his department, probably for two years. In connection with the Euston scheme, it was clear to me that there was no cost estimate for the AP3 scheme, as it is called; that is why we decided to price it for them. The figure came out at £8.25 billion. Because it was so high in relation to the total cost of phase 1, I thought it was very likely that there would be a serious cost overrun for phase 1, which could put the project at risk, which I do not want to happen.

If HS2 or his department have figures for costs, is the Minister willing to share them with us? We have a big schedule here of the costs of the whole project from railway control systems, train power, enabling works and building works to signalling. If we have got it wrong, I would like to know about it. We have a blank screen at the moment. Could we have a meeting on this before Report when we could share these costs with his officials?

Type
Proceeding contribution
Reference
777 c78GC 
Session
2016-17
Chamber / Committee
House of Lords Grand Committee
Back to top