Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015

This is what I am hoping we will hear more about from the Minister when she sums up: whether that work has been done or whether she agrees with the case that has been made for a national survey, which would obviously cause considerable delay.

That brings me to question of why this matter is urgent. Is it really necessary for a decision to be made now, for reasons that may be connected with the development of Sellafield, when we already have these additional reactors on the site, coupled with the existence

of large quantities of high-level waste? Is it a matter of immediate necessity that we should have this GDF in the timescale that would be possible with the order and not without it? Suppose we were forced to wait for five years or so: would that have a catastrophic effect on how we dispose of the nuclear waste at Sellafield? Would lacking the GDF impose impossible or very difficult restrictions on the work that can be done at Sellafield because of the quantity of high-level waste that has to be stored there?

Other things being equal, obviously it is better for the GDF to be in the neighbourhood of Sellafield because the high-level waste has only to move a short distance and it avoids the necessity for rail facilities to move all this waste from Sellafield, where it is at the moment, to whatever alternative site is chosen. That would add enormously to the cost, I suppose, and is something we would like to avoid if possible.

4.30 pm

Type
Proceeding contribution
Reference
759 cc356-7GC 