UK Parliament / Open data

Infrastructure Bill [HL]

Moved by

Baroness Worthington

95ZBM: Before Clause 28, insert the following new Clause—

“Shale gas extraction: baseline monitoring

(1) No shale gas extraction may take place before the operator has measured the baseline levels of methane in the groundwater over a 12 month period.

(2) After section 199(1) of the Water Resources Act 1991 (notice etc. of mining operations which may affect water conservation) insert—

“(1A) Notices under subsection (1) must, in the case of shale gas extraction, include baseline levels of methane in the groundwater.

(1B) Where a notice under subsection (1) includes baseline levels of methane in the groundwater, the Agency must issue a notice under subsection (2) requiring the levels of methane in the groundwater to be measured over a 12 month period.””

Type
Proceeding contribution
Reference
756 cc53-4GC 
Session
2014-15
Chamber / Committee
House of Lords Grand Committee
Back to top