UK Parliament / Open data

Growth and Infrastructure Bill

Amendment 75ZAB stands in my name and in the name of the noble Baroness, Lady Valentine. This amendment comes out of a fairly recent discovery about some new roads that have received permissions under development consent orders. If the developer wishes to put a charge or toll on them then, for some reason, it has to be a fixed-toll plaza, with lots of toll booths and the old fashioned things that one sees on motorways in France, on the M6 toll, and the Dartford crossing. It seems rather odd that a developer who seeks planning permission to build a toll road needs to be told as part of getting consent that if he is going to put a toll or a charge on it then it has to be a fixed-toll point. It seems to me that that has very little to do with planning—except for the planning permission of the site—and that the method of tolling should come out of a policy from the Department for Transport. I have had a useful meeting with officials on it.

It makes me recall the debate that we have in your Lordships’ House every now and then when the American embassy refuses to pay the congestion charge because it says it is a tax. One or two other embassies do the same thing. We all get a bit upset about that and the Foreign Office tries to make the embassies pay. It is an argument, but what is a toll, what is a charge and what is a tax? It is basically something you pay for going into a tunnel or across a bridge or up a road.

I have put down the amendment because I strongly believe that the Department for Transport should now have a policy on tolling. I do not mean which roads should be tolled and which ones should not be because that is a separate issue. We have the London congestion charge, we have tolls for the Dartford tunnel and for the Birmingham northern relief road, and we have lorry road-user charging coming in. The lorry road-user charging is going to be time-based rather than distance-based, which is odd. Nobody else in Europe is going time-based but that is probably why we are. Worse still, if these all move forward, you are going to have to have separate equipment in your car or lorry for each area, road, tunnel or bridge that you wish to use because I suspect that more and more of the crossings that now have toll booths will wish to convert to taking money while you are on the move because it is so much easier and cheaper and, of course, it is quicker for the person paying.

Cheapness comes into it. Noble Lords will correct me if I am wrong but the cost of collection of the congestion charge in London is something like 30% of the amount you pay. With some of the modern electronic systems used in other cities and some motorways on the continent, you are getting down to about 5%, which means that the developer keeps more of his money. One hopes that one day the Department for Transport, maybe in its new roads policy which we were told about earlier in the Committee stage, will come up with a policy on tolling. That should include one system for the whole country—one technical system—that you can have in your car. That means a common technology and it would be much better if it was common throughout Europe. Then it would be up to the developers, the Government or whoever to decide what rate should be charged for using whatever facility you need. We want to get away from the idea that if you are getting consent for a particular crossing or something with a development consent order, it has to specify the type of toll booth, which seems to be a rather retrograde step. I look forward to hearing the Minister’s response. I beg to move.

Type
Proceeding contribution
Reference
743 cc36-7 
Session
2012-13
Chamber / Committee
House of Lords chamber
Back to top