I agree completely. My constituency is not scheduled to benefit from the electrification project, but it is affected by flooding on the Somerset levels. It is vital that we make sure our railway is future-proofed. A few years back, I took a bus in the constituency of the right hon. Member for Exeter (Mr Bradshaw) when there was flooding on the railway line across Cowley bridge that looked like something out of the Bible. It is vital that we tackle the range of resilience issues, not just the very famous issue on the coast. I know that Network Rail is looking at the cliffs near Teignmouth. I am sure that my hon. Friend the Member for Newton Abbot (Anne Marie Morris) will talk a bit more about that in her contribution. That aspect needs to be looked at too, not just the sea wall. Much of the signalling throughout Devon and Cornwall was installed in the 1960s. It is listed for consideration in control period 6, which is between 2019 and 2024, and it is vital that that goes ahead because we must improve journey times and ensure a modern infrastructure.
The issue of resilience has been brought into focus by the imminent publication of the final report from the Peninsula Rail Task Force, which will set out its 20-year plan for railways in Devon, Cornwall and Somerset. Resilience will be at the heart of that, and it is vital to have the funding needed to complete such a commitment. There have been encouraging noises on that issue over the past week or two, and I hope that we might hear a couple more words from the Minister when she responds to the debate. It is clear just how vital it is that we secure that line.
Electrifying the Great Western route into south Wales is probably the single biggest project on that line since the Severn tunnel, and it will electrify the line in communities along that route—I suspect that colleagues may wish to speak a little more about that. It is pleasing that in the south-west it is no longer the case that the only way to get close to a bit of electrified track is to buy a train set! As a member of the Public Accounts Committee I have sat through a discussion on progress so far—not least the estimated cost of that electrification, which has now reached £2.8 billion—and I imagine that the Minister might not be relishing the thought of committing to more such projects. However, it is right that those issues are highlighted, as investment must not just be about creating a corridor for electric trains to speed through to south Wales; it must be the starting point for an integrated network of electrification across the areas served by Great Western Railway.