UK Parliament / Open data

Transport for London Funding

Proceeding contribution from Clive Efford (Labour) in the House of Commons on Tuesday, 15 December 2015. It occurred during Debate on Transport for London Funding.

They might well, but there are bridges beyond Vauxhall. I can point all the bridges out to the Minister if he needs me to do that; I can name them all. We need the Silvertown link, but it cannot be built without the DLR.

I want to move on to talk about a site in Kidbrooke, Henley Cross that is owned by TfL. TfL is definitely trying to maximise its income from that site, but we need such sites, which are in public ownership, to be used to provide local services and vital affordable housing where possible, not just sold off to the highest bidder. I would like to put in a bid to TfL to consider that site in relation to the Kidbrooke regeneration and the need to identify sites for secondary schools in the borough of Greenwich. Henley Cross is situated between the motorway—well, the approach road to the Blackwall

tunnel—and the railway. The site is unsuitable for people to live on, but it would be suited to other uses. Perhaps some sort of land swap could be arranged with the Kidbrooke Village regeneration and a school could be built where it was intended to build a Sainsbury’s supermarket. I urge TfL to sit down with the London borough of Greenwich and with Berkeley Homes, which is doing the development, to consider that option, rather than cramming housing on to the site, which is unsuitable because of its location.

Finally, I want to turn to TfL taking over the running of suburban trains, which are vital for my constituency as it relies entirely on suburban trains as the major route into London because—as I said—we do not have direct links to the London underground. If that is to happen, TfL needs to start planning ahead now. At peak times, trains that run through my constituency—through Eltham, New Eltham, Plumstead and along all those routes—are heavily oversubscribed. They have so many passengers they have PIXCs—people in excess of capacity. We need to increase capacity on those lines. That means that when the Thameslink scheme is completed and the new rolling stock becomes available, the current Thameslink rolling stock must be made available to Southeastern, which wants to purchase it, so that it can increase capacity on those vital services in south-east London.

10.29 am

Type
Proceeding contribution
Reference
603 cc462-3WH 
Session
2015-16
Chamber / Committee
Westminster Hall
Back to top