UK Parliament / Open data

Rail Services: Portsmouth and the South-West

Absolutely—that is music to my ears, given that we are going to be waiting until November next year for a plan. Consistently, there is hostile development on green spaces. Those are not sustainable places on which to be building, and at the moment, a planning application for a car lot and a drive-through restaurant is going through for the old council offices. That is a sustainable place for more houses that would be within walking distance to Eastleigh train station.

In Eastleigh, we have Southampton airport, which is an important regional airport and a hub for passengers coming into the area from Guernsey in particular. It has been highlighted, however, that it is sometimes easier for people to get to Gatwick than to Southampton, given that they can take a train from Swanwick heading up towards Gatwick and fly out that way, rather than trying to get from Guernsey or the island into Southampton to fly. That is a big concern for me. We have many short commutes that should be eminently doable, but they are a major problem because of the amount of people doing those commutes on a struggling motorway, with no rail option. We have an extremely important enterprise

zone bid based around the airport. The local enterprise partnership is backing that, but it can work only if we get better rail services. We need bypasses and link roads, and I have been making the case for those very strongly.

In conclusion, as we have heard, the Transport Secretary has kindly visited my patch. He knows the importance of Eastleigh. It is a great place to work, live and do business, but it is a terrible place to get around. The new franchise in 2017 is a vital opportunity for all of us across Hampshire and the south-west to seize the opportunity and stand up for the Solent and the south-west corridor. We must deal with capacity, power supply and the Waterloo throat issue. We must fight for investment, recognise the demand increase and ensure that we enact as much as possible, as soon as possible, from the Wessex route study.

10.32 am

Type
Proceeding contribution
Reference
600 cc360-1WH 
Session
2015-16
Chamber / Committee
Westminster Hall
Back to top