I can certainly put the right hon. Gentleman right on that point. Eleven new platforms will be built for HS2 at the station, and 11 will remain in the current station to serve the existing network. Five approach tracks will remain, and there will be four for a period of approximately three years during construction. Works on the existing tracks and platforms will enable existing services to be accommodated. Those works will be undertaken prior to the start of the construction of the main HS2 works.
High Speed 2 will provide a step change in capacity on the west coast main line by enabling long-distance passengers to make their journeys much faster on the new line. This will free up space on the existing network for faster, more frequent trains. Indeed, it will also free up space on those platforms. I want to make it clear that for the existing west coast main line, the number of platforms will be reduced from 18 to 11, while the number for HS2 will increase from zero to 11. This means that there will be 22 platforms in total, which is four more than at present. The HS2 trains will also be longer, and the way in which they load their passengers will make it easier for people to get on them. That is because there will be a system similar to the one used by Eurostar, in which passengers come down escalators on to the platforms. This will avoid the situation of everyone trying to rush down to one part of the platform as the train starts to load.