Yes, indeed.
My second alternative to HS2 is to upgrade the east coast main line. It needs to be four-tracked at Welwyn with an extra viaduct, a flyover at Peterborough, a flyover at Newark and four-tracking in various places, so that there can be non-stop services from King’s Cross to Edinburgh in three and a half hours, which was done on a test run in 1990; indeed, that test run was slightly faster than is being proposed with HS2. [Interruption.] Not a problem.
Finally I will propose what I have proposed before, which is the Great Britain freight route. That is a dedicated rail freight line, to carry lorries on trains from the channel tunnel to every major region of Britain, using old trackbed and under-utilised lines, without causing any environmental or planning problems. The details are included in my paper here, which I have submitted to others from time to time.
Those three alternatives together would cost a tiny fraction of what it is proposed HS2 will cost and would be infinitely more useful. Indeed, the freight line would pay for itself.
I will leave my case there. I would love to speak for longer; I can speak for another two hours unaided, if you wish, Mr Betts, but I have probably said enough.