UK Parliament / Open data

High Speed 2

Proceeding contribution from Kelvin Hopkins (Labour) in the House of Commons on Wednesday, 25 March 2015. It occurred during Adjournment debate on High Speed 2.

Yes, indeed.

My second alternative to HS2 is to upgrade the east coast main line. It needs to be four-tracked at Welwyn with an extra viaduct, a flyover at Peterborough, a flyover at Newark and four-tracking in various places, so that there can be non-stop services from King’s Cross to Edinburgh in three and a half hours, which was done on a test run in 1990; indeed, that test run was slightly faster than is being proposed with HS2. [Interruption.] Not a problem.

Finally I will propose what I have proposed before, which is the Great Britain freight route. That is a dedicated rail freight line, to carry lorries on trains from the channel tunnel to every major region of Britain, using old trackbed and under-utilised lines, without causing any environmental or planning problems. The details are included in my paper here, which I have submitted to others from time to time.

Those three alternatives together would cost a tiny fraction of what it is proposed HS2 will cost and would be infinitely more useful. Indeed, the freight line would pay for itself.

I will leave my case there. I would love to speak for longer; I can speak for another two hours unaided, if you wish, Mr Betts, but I have probably said enough.

Type
Proceeding contribution
Reference
594 c529WH 
Session
2014-15
Chamber / Committee
Westminster Hall
Back to top