UK Parliament / Open data

Environmental Challenges (Somerset)

I gratefully thank my hon. Friend, who has helped immeasurably, because the barrage is in fact in Bridgwater, not Taunton Deane. His point is exactly right. Both the former Secretary of State, my right hon. Friend the Member for North Shropshire, and the present Secretary of State have made it clear to the Environment Agency that plans for the funding need to be in place to make absolutely sure that they go into the autumn statement—which I believe will be on 3 December 2014—so that we can get the money to get this done.

My hon. Friend the Member for Taunton Deane knows this far too well—a lot of his constituency was also flooded—but if we did not build the barrage, we would never be forgiven for creating the problems and the mess again. The barrage will be a surge barrier that stops 60% of the mud that comes all the way up the river to Taunton Deane, which is a distance in the region of 10 miles. The barrage would therefore reduce the silting and the need to dredge, which means that we could continue pumping. We were not able to pump in his constituency or in most of the levels because our water levels were too high. The barrage would give us an opportunity not only to combat climate change, which the Minister will tell us about in a minute, but to address the practicalities of everyone’s daily lives. I look forward to hearing her remarks.

4.13 pm

Type
Proceeding contribution
Reference
586 cc301-3WH 
Session
2014-15
Chamber / Committee
Westminster Hall
Back to top