UK Parliament / Open data

High Speed Rail (London – West Midlands) Bill

I agree with the Secretary of State. I would add, however, that further benefits to these northern cities and Birmingham could be accrued if we did more than just fulfil the intention of the direct links through to the continent of Europe. Although I understand why the previously proposed way of doing that has not gained support, I hope that we will still look at the possibility of reinstituting a direct connection between HS1 and HS2, and that when we look at the costs and benefits of that we look not only at the benefits to the

north of being able to get through to Europe, but at the benefits for people from Manchester or Birmingham of being able to go directly through to east London, Kent or East Anglia from a connection at Stratford. The work Greengauge 21 did on that shows that the benefits will be huge. Yes, there would be benefits for my constituents and people in east London from being able to go from Stratford or Ebbsfleet through to Old Oak Common and on to the north, but a connection would also significantly add to the benefits for people coming from Birmingham and the north. I hope we will look at that.

I believe that there is scope within this Bill to make such improvements. From listening to some of the opponents, it is as if they assume that the costs are going to spiral out of control and that the benefits are all grossly exaggerated, but when I look through the work and the detail of the estimates and calculations, they strike me as extraordinarily conservative.

We have learned the lessons from the great infrastructure projects of the past. If we consider Crossrail or the Olympics, we see it is possible to deliver projects to time and to budget, and possibly faster or cheaper. Part of the reason for that is the very big estimate for contingency. Some people criticised, and we have heard Opposition Front Benchers saying that perhaps they would not support a project if costs were spiralling, but actually a substantial contingency had been factored in: £14.5 billion of the £42.6 billion is contingency. It is not contingency in order to get to our best estimate of what the cost is going to be; the contingency has been padded to the degree that we are 95% certain that the cost will come in below the number given. It is expected that more than £4 billion of that contingency will not be used, so perhaps some of that could be put towards providing a decent quality link between HS1 and HS2, to everybody’s benefit.

Type
Proceeding contribution
Reference
579 cc653-4 
Session
2013-14
Chamber / Committee
House of Commons chamber