UK Parliament / Open data

High Speed Rail (London – West Midlands) Bill

I believe there is a good cost-benefit ratio. We estimate the cost-benefit ratio to be 2.4 and it is worth pointing out—I will come on to this in my speech—that the initial cost-benefit ratio for the Jubilee line was less than 1% and if that had not been built I do not think we would have seen the subsequent development in Canary Wharf. However, I do not want to be tempted too much away from the very detailed contextual part of my speech, which I have worked out.

Type
Proceeding contribution
Reference
579 c559 
Session
2013-14
Chamber / Committee
House of Commons chamber
Back to top