I am awfully sorry, but if I give way to the right hon. Gentleman I will have to give way to others, and so many people want to speak that I will eat into the time allowed to them. The right hon. Gentleman can make his own speech.
The Secretary of State for Transport claims that HS2 is essential to deal with an impending capacity crisis on the west coast main line. However, the available figures show that intercity trains on the west coast main line coming into Euston are on average just 52% full in peak hours. There is severe commuter overcrowding on many commuter lines into all our major cities, and HS2 will do very little, or in many cases nothing at all, to relieve that. Is the commute into Euston really the priority over other areas?
The big picture is the claim that HS2 will heal the north-south divide. Even today the Institute of Economic Affairs has again questioned the promises of an economic transformation of the north. There is no academic peer-reviewed evidence to show that the presence of a high-speed rail line will lead to increased economic output at the levels suggested in what is now a questionable
report from KPMG, commissioned by HS2. The report claims that HS2 would bring benefits of £15 billion per year. However, it assumes that rail connectivity is the only variable driving local economic growth. We know that that is simply not the case; if it were, Ebbsfleet in Kent would be a boom town.
However, London could be the winner. The majority of academic evidence available in other countries shows that where a high-speed rail line connects a dominant city to a less dominant town or city, it is the dominant city that gains. HS2 will suck skills and businesses to London rather than to our regions. If HS2 had a viable business case, it should have been built starting in the north, connecting the northern cities to each other and then eventually to London.
We are getting a project that has markedly changed since it was first proposed. HS2 was going to allow someone to jump on a train in Manchester and travel straight to Brussels, but that has now been ditched. The direct link to Heathrow has of course now been dropped, but in any event why are we not going for maximum connectivity to our airports in the south by finalising our high-speed rail policy after the result of the Howard Davies commission?
My right hon. and learned Friend the Member for Beaconsfield would also like assurances from the Government on the so-called Heathrow spur, on which he still has many questions. Even the much vaunted connections between the towns and cities are far from perfect. In fact, HS2 connects only four city centres. The proposals for Euston are not settled and Old Oak Common will require an enormous amount of work to connect it to the rest of London’s transport infrastructure. The HS2 station in Birmingham is a 15 minute walk through an underpass to Birmingham New Street, where the rest of the city’s trains come in. If we look to the plans for Sheffield Meadowhall, Toton and Derby, the HS2 stations will be miles outside city centres. The latest business case included £8.3 billion of cuts to existing rail services, affecting many towns and cities, and the KPMG report showed that many local economies away from the line of the route would suffer. The main objective to shorten journey times drastically has now been questioned by calls from the Environmental Audit Committee to decrease average speeds. That means that HS2 may not even achieve its original aims on either speed or connectivity.
Finally, HS2 is not really green. A meagre 1% of HS2 passengers are predicted to transfer from air, and just 4% from cars. The remaining 95% of passengers are predicted to be new journeys or transfers from less polluting modes of transport, and that is before we examine closely the vast amount of power needed to power the railway. If the project goes ahead, it is important that we protect the environment and the people who will be affected. People expect the project to be implemented to the highest standards, ensuring the best environmental protections and giving support to the communities and individuals who are severely affected.
The Chilterns area of outstanding natural beauty is in my constituency, as everybody now knows. It is known as the lungs of London and is the last large expanse of protected unspoilt countryside in the south-east of England. There are more than 50 million visits annually, and many of the villages, hamlets, ancient woodlands and hedgerows remain largely unchanged since Norman times. The Chilterns is designated under
the Countryside and Rights of Way Act 2000, and the Government have a legal duty to adhere to those protections: anything less would make a mockery of all the Government’s pledges to protect our natural environment.
The Environmental Audit Committee’s report of 7 April was highly critical of the project and said that the Government have “significant work to do” to prove that they are prioritising environmental protection. Some 40% of the route is yet to be examined. If the project does proceed, I now believe that the only way to mitigate properly the damage to the AONB is to fully tunnel the whole area. The demand for longer tunnelling through the AONB was the most frequently raised concern in the responses to the environmental statement, with more than 8,000 people raising it as an issue. The line will already have a devastating impact on the AONB, including destroying 10.2 hectares of irreplaceable ancient woodland, as well as communities such as South Heath and Wendover.
My right hon. Friend the Member for Aylesbury and I have worked together on considering HS2 and the long tunnelling option. He has said to me that if he is not satisfied with the arrangements for mitigation of the AONB and compensation, particularly where Dunsmore, Wendover Dean and Wendover are concerned, he will join me in the Lobby and vote against the project on Report and Third Reading. As it stands, Buckinghamshire will take all the pain and have no gain. My right hon. and learned Friend the Member for Beaconsfield has constituents in Denham who remain entirely unpersuaded by the arguments put forward both in respect of the generality of the proposal for HS2 and of the detail. The impact of the Colne valley viaduct travelling through a site of special scientific interest, with no details on how the noise will impact on the local community, is a source of real anxiety. His constituents have argued for further tunnelling under the Colne. It is important to remember that the voices of our Buckinghamshire colleagues in Government are as equally important as the voices of Back Benchers, if not more so. I want allies inside the Government, as well as on the Back Benches, as we scrutinise this project.
On compensation, we have had no less than five consultations and still those people whose homes and livelihoods have been devastated by HS2 have had to wait for over four years for the final compensation scheme to be announced. The eventual compensation announcement on 9 April was not popular. I know that the concerns are shared by Mr Speaker. He believes that the fact there is no provision for homeowners whose properties are further than 300 metres from the line but who have seen their property fall in value as a result, is unacceptable and so do I.