UK Parliament / Open data

High Speed Rail (Preparation) Bill

It is a pleasure to follow, even at two thirds of the rate, the stirring speech made by the hon. Member for Spelthorne (Kwasi Kwarteng). I support the Bill, the principle and, indeed, the route—with the caveat about the London terminus—for many of the reasons given by the Secretary of State and shadow Secretary of State. It seems bizarre that when most of the developed world believes in having a high-speed rail network, we might want to rely on 19th-century railways. That is not to disparage the existing railways, which have stood us and continue to stand us in good stead, but the example of how they were built is one that I think we should follow, rather than shy away from. Having said that, I am concerned about pricing. Completion is a long way off, and there is a danger of this becoming a rich man’s railway. Cost control is an issue, and costs have spiralled before the project has even left the drawing board. There is also the issue of compensation, and whether it will be adequate.

It appears, however that there is consensus—given the time, I shall restrict myself to this—about the proposal that Old Oak, which is in my constituency, should be the major interchange. It would become the fifth busiest station in the country, with a Crossrail station, and links to HS1, tube lines, First Great Western services and Heathrow. A rail interchange in west London would be of massive benefit in an area much of which is categorised as being in the 1% most deprived in the country. Within a mile of the proposed station, 50% of the adult working population is unemployed.

On Friday, the boroughs and the Greater London authority will publish a vision for the future of Old Oak, described in rather hyperbolic terms as the new Canary Wharf. There is talk of 90,000 jobs and 19,000 new homes, and I am pleased that the boroughs have already taken an interest. However, there are local problems. As currently envisaged, there are poor links with HS1, tube lines and the west London line. There is an inadequate road network and poor-quality station design. We should look at the option of making Old Oak the terminus. I have an open mind on that, although I know that my right hon. Friend the Member for Holborn and St Pancras (Frank Dobson) would urge me to be stronger in my opinion because he does not want the line to go to Euston, and he is certainly right that the connectivity from Old Oak is better than the connectivity from Euston. It appears that HS2 Ltd wanted to go to Euston simply because it wanted to say that it had a central London terminus, but it should look at that

again. With all due respect to my hon. Friend the Member for West Ham (Lyn Brown), who is no longer in the Chamber, Stratford International is an exception to the rule, “If you build it, they will come.” There is consensus about where the interchange should be.

My other caveat is that we have to take care with the construction. Most compulsory purchase schemes are hopelessly inadequate both in the compensation that they offer and the way in which people are dealt with. The effect on small businesses and even large businesses—Cargiant is in my constituency, as well as Wormwood scrubs, which is a large area of important open space—must be considered, and I hope that the project will be undertaken sympathetically, however important it is to the nation. Finally, I back my right hon. Friend the Member for Holborn and St Pancras in saying, “Please take HS2 Ltd off the job”. The company is not making a good job of promoting the scheme, and we should find someone who will take this national project forward in the way that it should be done.

5.37 pm

Type
Proceeding contribution
Reference
565 cc386-7 
Session
2013-14
Chamber / Committee
House of Commons chamber
Back to top