UK Parliament / Open data

High Speed Rail (Preparation) Bill

I will not, if the hon. Gentleman will forgive me. I have already given way twice.

My last point comes from the experience of being responsible for building the second runway at Manchester airport. Paying compensation on the basis of free market value at the time is an extremely costly way of building infrastructure. Giving free market value plus 10%, 20% or 30%—whatever is appropriate—will speed up the process and save money. I hope the Government will give consideration to that, and to serious mitigation. If people take legal action because they think they are being treated unfairly, and if there is blight for a long time, that will hinder the project. It is estimated that delays in tunnelling on some high-speed routes have cost as much as the actual tunnelling. I therefore hope that on compensation the Government will not be short-sighted. I hope they will deal with the problems outlined by my hon. Friend the Member for Sheffield South East (Mr Betts) and my right hon. Friend the Member for Holborn and St Pancras (Frank Dobson), and be generous in looking at the problems and pain caused. That will benefit the high-speed system in the end.

4.48 pm

Type
Proceeding contribution
Reference
565 cc372-3 
Session
2013-14
Chamber / Committee
House of Commons chamber
Back to top