UK Parliament / Open data

Energy Bill

Proceeding contribution from Emily Thornberry (Labour) in the House of Commons on Tuesday, 22 January 2008. It occurred during Debate on bills on Energy Bill.
I would like to discuss many different aspects of the matter that we are considering. However, given the amount of time, I will focus on renewables, especially our potential for using wind power. Britain could be the Saudi Arabia of wind power. I understand that we have about 40 per cent. of Europe's wind, which we could use to improve our country. It is said that there is no point in relying on wind power, because what do we do on the day the wind does not blow? However, according to the UK Energy Research Council,"““intermittent generation need not compromise electricity system reliability at any level of penetration foreseeable in Britain over the next 20 years.””" For those of us who do not have an engineering degree, I should perhaps go over some of the basics, because some of these things were beyond me. For those who think that a gigawatt is the brother of the Jabberwocky or something from a comic, it means roughly this. One kilowatt-hour of electricity is enough to power an electric bar fire for about an hour. One megawatt-hour will power 1,000 electric bar fires, while 1 gigawatt-hour will power 1 million electric bar fires for an hour. I will not make my whole speech in terms of electric bar fire units, but I hope that the House gets the idea, because that certainly helped me. The Minister for Energy said this morning that we need a sevenfold increase in renewable energy by 2020. Most of that will need to come from an increase in renewable electricity, which means an increase from 5 per cent. of electricity coming from renewables to between 30 and 40 per cent. How are we going to do that in 12 years? It sounds like a fantasy, but it is possible. That is what the Labour party is about—we are about achievable goals and we can do it, as long as we are bold. Denmark got up to 20 per cent. of renewables from a standing start a few years ago, and we can do as well as that. However, we need to make some difficult decisions and move some of the obstacles that we have put in our own way. I am glad that the Government have already set about getting rid of some of them. First, we have created a market for renewables and established the renewables obligations—obligations on energy companies to provide a proportion of their energy from renewable sources. Introducing banding will mean that 1 GW of energy produced by offshore wind, tidal or wave power will create more renewables obligation certificates than the equivalent from onshore and other renewables. Secondly, we have conducted two rounds of bids, in 2001 and 2003, to identify offshore sites for wind energy, amounting to 8 GW in total. Projects such as the London Array, the biggest wind farm in the world, have now been given the go-ahead through that process. In December, the Secretary of State extended the ambition for offshore wind, by announcing potentially 25 GW more in possible sites. Thirdly, the committee on climate change, to be created by the Climate Change Bill, will set out measures to allow us to hit our aim of a 60 per cent. cut—I hope an 80 per cent. cut soon—in carbon emissions by 2050. The committee will give much-needed guidance and advice, in order to ensure that we push the renewables agenda forward. Finally, the independent planning commission, contained in the Planning Bill, will play an important role in ensuring that applications for wind energy are dealt with swiftly and efficiently. However, we still have too many self-imposed obstacles in our way. The sites for offshore wind that were identified in 2001 and 2003 are taking too long to come to fruition, and no wonder when one considers all the hoops that applications have to jump through. First, the Government identify the areas. Secondly, the Crown Estate is given these and asks for bids for development. Thirdly, companies make bids. Fourthly, the Crown Estate gives exclusive rights to develop. Fifthly, the developers conduct an environmental assessment, which covers everything from bird migration and navigational routes to seals and the fishing industry, and so on. Then the developers put together their plans for development and another application is made to the Department for Business, Enterprise and Regulatory Reform to build. After that, permission to install and build is given. Only then can companies finalise their connection to the grid, so that the necessary equipment can be procured and work planned. Companies then need time to get their financial package together, which can slow down the time it takes to start building. Then building can start, but before that happens, there must be further planning permission for transmission, hence the lag. From what I understand, the problem is not just the putting up of the poles and wires—that also needs planning permission—but the building of substations and the reinforcement of lines where necessary. Ofgem needs to relax its policy on investment in the national grid, to allow a predict-and-provide approach, so that wind farms that are ready to go are not held back by a lack of capacity to get on to the grid. Ofgem's role needs to be examined, to give it stronger direction and ensure that we focus on sustainability, either by directives from the Secretary of State or by changing its objectives in statute. We also need to put an end to the ludicrous situations in which an offshore wind farm application has jumped through all the hoops only to be held up by an individual onshore council's planning committee, which is probably Lib Dem. The proposed independent planning commission will have an important role to play in making the passage of applications for major infrastructure projects quicker and easier. However, as I understand it, its role will be limited to 15 big projects or 25 smaller ones. Given that there are currently more than 200 applications for generators over 50 MW or for large pylons under sections 36 or 37 of the Electricity Act 1989, the IPC will surely need to have a larger capacity in order to help the development of wind farms to motor on. The present system is not working; 95 per cent. of applications for wind farms are not decided within the statutory 16-week period. Normally, 70 per cent. of planning applications are decided within 16 weeks, but for wind farms it is only 5 per cent., and most of those applications are rejected. So we need to ensure that the IPC has more capacity. Concern has also been expressed that the marine management organisation envisaged in the proposed marine Bill might give permissions on a different basis to that used by the IPC. Consistency is obviously important to the industry, if it is to develop properly. There is currently 7.5 to 8 GW of wind power stuck in the planning system, half of which is being held up by the Scottish Executive. That is not good enough. If we really want to push on with renewables, we need to have a strong heart. We need to be radical, and we must not be afraid. We can do this, and if we do, we might well find that the policy initiative to build new nuclear capacity will be seen to be a cul-de-sac. We do not need that nuclear power. If we do renewables properly, we will be able to fulfil all our needs. Let us also think of the good that it will do for us and for our industry. The Prime Minister said in November last year that we need vision and determination. He went on:"““If Britain maintains its share of this growth there could be over a million people employed here in our environmental industries””." Building a low-carbon economy will enable us to create thousands of jobs, and Britain is exactly the kind of country that can do that. We have the capacity and the skills to build planes for our defence forces, and we have a huge amount of wind potential in this country. We just need to take away the obstacles that we have put in place ourselves. Let us concentrate on doing that. Let us be bold and radical. Let us lead the fourth technical revolution. Let us get on with it.
Type
Proceeding contribution
Reference
470 c1450-3 
Session
2007-08
Chamber / Committee
House of Commons chamber
Legislation
Energy Bill 2007-08
Back to top